top of page
200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh
220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

OUR PROJECTS

Our Industry Specialization

COMPANY STATISTICS

Some Interesting Facts

289

COMPLETED PROJECT

30

MSFT. COMPLETED

82

On-GOING PROJECT

SOME INTRESTING FACTS

With over 120 projects finished and 30 million square feet developed for buildings and factories, we're soaring high. Currently, we're actively engaged in 80 exciting projects, shaping the future of vertical construction.

200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh

We constructed a new power station in Pampanurthanda (Bhanukota Village) and installed a double circuit power line from Hindupur to Pampanurthanda (Nuthimadugu) in Anantapur District. This helped improve electricity supply in the area.

CLIENT

AP TRANSCO

END DATE

Completed

220KV DC Line from Maheswaram to Fabcity, Hyderabad

We're tasked with supplying, erecting, testing, and commissioning a 220KV double-circuit line spanning 23 km from Maheswaram 400/220KV SS to FAB City 220/132KV SS. Additionally, we're handling a multi-circuit line covering 10 km from Maheswaram to Dindi bonguluru LILO Line, along with installing two 220KV bays at FAB City's substation.

CLIENT

TS TRANSCO

END DATE

Completed

220KV MC line from Naraspur to Bowrampet, Hyderabad

We handle the full process: supplying, erecting, testing, and commissioning a 220KV multi-circuit line spanning 40 kilometers, connecting the Narsapur and Bowrampet substations in Rangareddy District.

CLIENT

TS TRANSCO

END DATE

Ongoing

220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

We built and expanded power infrastructure in Guntur District! This involved setting up a new 220/132KV substation in Guntur, extending bays at the Sattenapalli substation, and installing new lines to connect them. Additionally, we established a new 132/33KV substation at Ponnuru for better electricity distribution. Exciting times ahead

CLIENT

AP TRANSCO

END DATE

Completed On 2021

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

Supplying, installing, testing, and commissioning a 220/132KV substation in Pydibhimavaram, along with erecting 220KV and 132KV double circuit lines in Srikakulam district on a turnkey basis. Operations include a 2-year period post-commissioning.

CLIENT

AP TRANSCO

END DATE

Completed

Replacement of Insulators in the existing 400KV line at Nelamangala-Talaguppa, Shivamogga, Karnataka

Offering a comprehensive solution: replacing weakened Porcelain Disc Insulator Strings with Silicon Rubber Composite Polymer Long Rod Insulator Strings along the 400KV DC Talaguppa-Shanthigrama-Nelamangala Transmission line. Locations covered include those under Buy Back in Hassan and Tumkur Transmission Zones.

CLIENT

KPTCL

END DATE

Completed

OUR WORK

Other Projects

Heading 2

Add to Cart

Heading 2

Add to Cart

Heading 2

Add to Cart

200KV/132 KV substation at Bhanukota and 220KV Line from Hindupur to Bhanukota, Anathapur, Andhra Pradesh

220KV DC Line from Maheswaram to Fabcity, Hyderabad

220KV MC line from Naraspur to Bowrampet, Hyderabad

220KV/132 KV substation at Prathipadu and 220KV Line From Sattenapalli to Prathipadu ,Guntur, Andhra Pradesh

220KV/132 KV substation at Pydibhimavaram and 220KV Line From Garividi to Pydibhimavaram ,Srikakulam , Andhra Pradesh

Replacement of Insulators in the existing 400KV line at Nelamangala-Talaguppa, Shivamogga, Karnataka

OTHER VERTICALS

Transportation

Building &

Factories

bottom of page