With over 120 projects finished and 30 million square feet developed for buildings and factories, we're soaring high. Currently, we're actively engaged in 80 exciting projects, shaping the future of vertical construction.

NH-130, Six Lane Basanwahi – Marangpuri Section, Chattisgarh

We're working on building a six-lane road in Chhattisgarh, from Basanwahi to Marangpuri, as part of the Raipur-Visakhapatnam Economic Corridor. This includes constructing a 2.79 km tunnel, using a hybrid annuity model.

CLIENT

SECTOR

Road, All Projects

END DATE

Ongoing

NH-365BG, Khammam - Devarapalli Expressway, Telangana

CLIENT

SECTOR

All Projects, Road

END DATE

Ongoing

Bhima Bridge, Gulbarga, Karnataka

The bridge spans 420 meters over the Bheema River on the Hippargai-Kona-Saradagi road in Jewargi Taluk. The approach road is 2.56 kilometers long with 12 spans of 35 meters each, supported by 60 PSC girders and 12-meter-wide cast-in-situ deck slabs on both sides for footpaths.

CLIENT

SECTOR

Bridge, All Projects

END DATE

Completed

Elevated taxi way and flyover at IGI Airport, New Delhi

We built an Elevated Taxiway Bridge, 148m long and 202m wide, connecting Terminals T1 and T3 for smoother taxiing of flights. Additionally, a 492m Flyover, with spans ranging from 15m to 60m, was constructed using various structures like Cast-In-Situ RCC-T Girder and PSC Box Girder. Its purpose was to expedite traffic flow between Terminal T1 and T3, potentially saving travelers around 10 minutes in travel time.

CLIENT

SECTOR

Airport, All Projects

END DATE

Completed

Manohar International Airport-Runway & Taxiway, Goa

The construction project at MOPA Airport in North Goa involved building a flexible pavement system for a 3.55km runway, alongside parallel, connecting, cross, and rapid taxiways spanning various lengths. Additionally, drains, culverts, and other infrastructure were installed to ensure efficient operations.

CLIENT

SECTOR

Airport, All Projects

END DATE

Completed

NH-365, Nakrekal to Thanamcherla Road, Telangana

In Telangana, our team upgraded a 66.75 km stretch of NH 365 from Nakerakal to Tanamcherla. We transformed it into a smooth Two Lane road with Paved Shoulders and a strong PQC surface. The project included building 13 minor bridges, 2 Major Bridges, 1 flyover, and adding Service roads along with metal beam crash barriers for safety.

CLIENT

SECTOR

Road, All Projects

END DATE

Completed

OUR WORK

Other Projects

Heading 2

Add to Cart

Heading 2

Add to Cart

Heading 2

Add to Cart

OUR WORK

Our Industry Specialization

Highways

Bridges

Airports

Railways

NH-130, Six Lane Basanwahi – Marangpuri Section, Chattisgarh

NH-365BG, Khammam - Devarapalli Expressway, Telangana

Bhima Bridge, Gulbarga, Karnataka

Elevated taxi way and flyover at IGI Airport, New Delhi

Manohar International Airport-Runway & Taxiway, Goa

NH-365, Nakrekal to Thanamcherla Road, Telangana

OTHER VERTICALS

Buildings &

Factories